Morris Brown Field Hockey Stadium

PROJECT LIST

 •  Theater and Auditorium Projects

 •  Educational Technology Projects

 •  Corporate Headquarters and Training Facilities

 •  Government Facilities

 •  Acoustic and Noise Control Projects

 •  Recording and Production Facilities

 •  Worship Space Projects

 •  Sports Arena and Stadium Projects

 

SPORTS ARENA AND STADIUM PROJECTS


Fellowship Christian School, Roswell, GA - Review of a proposed football field and existing neighborhood layout. Measure and evaluate typical ambient sound levels in the area. Estimate typical noise levels from football games. Compare anticipated levels with City of Roswell and Fulton County Noise Ordinances. Provide an Acoustical Report with calculations, comparisons and include recommendations for ways to reduce the sound levels.
Client: Randall Paulson Architects, Roswell, GA - 2005, 2006


Georgia Dome Phased Renovation, Atlanta, GA - Assistance in acoustical and sound system testing and evaluations for partial upgrades. Proposed in a three phase upgrade are acoustical changes and sound system upgrades. First phase is completed.
Client: Wrightson, Johnson, Hadden & Williams, Inc., Dallas, TX - 2004, 2005


American Airlines Arena, Miami, FL - Home of the NBA Miami Heat. Assistance to Wrightson, Haddon, & Williams Inc., of Dallas, Texas, the prime acoustical consulting firm as the Florida Professional Engineer of Record. Provided design services, construction management and final testing of the arena sound reinforcement system, television distribution system and video replay systems.
Client: Wrightson, Haddon, & Williams Inc., Dallas, TX - 1998, 1999


New Atlanta Philips Arena, Atlanta, GA - Home of the NBA Atlanta Hawks and the NHL Atlanta Thrashers. Assistance to Wrightson, Haddon, & Williams Inc., of Dallas, Texas, the prime acoustical consulting firm as the local representative for the project. Provided design services, construction management and final testing of the arena sound reinforcement system, television distribution system and video replay systems.
Client: Wrightson, Haddon, & Williams Inc., Dallas, TX - 1997, 1998, 1999


Broward County Civic Arena, Sunrise, FL - Home of the NHL Florida Panthers. Assistance to Wrightson, Haddon, & Williams Inc., of Dallas, Texas, the prime acoustical consulting firm as the Florida Professional Engineer of Record. Provided design services, construction management and final testing of the arena sound reinforcement system, television distribution system and video replay systems.
Client: Wrightson, Haddon, & Williams Inc., Dallas, TX - 1997, 1998


Centennial Olympic Stadium, Atlanta, GA - Site of the Opening and Closing Ceremonies and Track & Field Games. Assistance to Wrightson, Haddon, & Williams Inc., of Dallas, Texas, the prime acoustical consulting firm on the project. Assistance on project site issues and loudspeaker performance testing during installation. Assistance to the sound system installation contractor, Ancha Electronics on project issues and testing.
Client: Wrightson, Haddon, & Williams Inc., Dallas, TX - 1996


Olympic Tennis Center, Stone Mountain, GA - Speech Reinforcement System design and project management for the 5000 seat center court stadium, site of Olympic Tennis competition. Small format mid-range horn design for voice announcements only during sporting events. Distributed loudspeaker system required for covered Plaza seating sections. Sound reinforcement loudspeaker mapping and system design. Limited preparation of engineering drawings and bid specifications for construction
Client: Atlanta Committee for the Olympic Games (ACOG), Atlanta, GA - 1996


Morris Brown College Stadium, Atlanta, GA - Full range sound reinforcement system design for speech and entertainment in the 15,000 seat stadium used for Olympic Field Hockey. Large loudspeaker array located on the scoreboard provides full range coverage to the stadium seating. Sound reinforcement loudspeaker mapping and electronic system design. Limited preparation of engineering drawings and bid specifications for construction.
Client: Atlanta Committee for the Olympic Games (ACOG), Atlanta, GA - 1996


Clark Atlanta University Stadium, Atlanta, GA - Full range sound reinforcement system design for speech and entertainment in the 7,000 seat stadium used for Olympic Field Hockey. Loudspeaker array located on the skybox provides full range coverage to the stadium seating. Sound reinforcement loudspeaker mapping and electronic system design. Limited preparation of engineering drawings and bid specifications for construction.
Client: Atlanta Committee for the Olympic Games (ACOG), Atlanta, GA - 1996


Morehouse College Gymnasium, Atlanta, GA - A 6000 seat gymnasium, the site of the Olympic Basketball Preliminary Games. Acoustical analysis of building design for excessive reverberation and noise levels. Sound reinforcement loudspeaker mapping and system design. Limited preparation of engineering drawings and bid specifications for construction.
Client: Atlanta Committee for the Olympic Games (ACOG), Atlanta, GA - 1995, 1996


Gator Bowl Stadium, Jacksonville, FL
Assistance to WJHW, Inc., on final adjustments, set-up and performance testing of the stadium sound reinforcement system.
Client: Wrightson, Haddon, & Williams Inc., Dallas, TX - 1995


Gettysburg College, Gettysburg, PA
Performance specifications for a Sports Complex including; Gymnasium, Field House, Multi-purpose Activity Room and Administrative Offices.
Client: JTM Associates, Atlanta, GA - 1989



Member Firm - National Council of Acoustical Consultants

L E E   S O U N D   D E S I G N
1474 Stephens Drive, NE
Atlanta, GA 30329-3745
voice: 404-633-8590
fax: 404-633-1914
Email

© Lee Sound Design, Inc. 1993 - 2010